Organization Logo

Perfusion Checklist

Checklist.doc (MsWord)

Checklist.pdf (Acrobat)

FPatient
q
ID correct

q Chart reviewed

FSterility
q
Components: integrity and expire date 

FHeart-lung machine
q
Power connected

q Start-up normal

q Back-up power

FHeater-Cooler
q
Start-up normal

q Water connections: flow verified

q Water temperature: _______° C/F

FGas Supply
q
Gas lines connected

q Flow meter/blender in order

q Vaporizer shut off

q CO2 flush

FPump
q
Roller heads not obstructed

q Flow meter: calibration & direction

q Tubing holders secure

q Occlusion set : ______ mmHg ______cmH20/min

FTubing
q
Pump tubing condition inspected

q Suckers functional and sucking

q One-way valves: direction correct

q Circuit shunts closed

FID

FMonitoring
q
Temperature probes positioned

q Pressure transducers calibrated

q In/On-line sensors calibrated

FSafety & Alarms
q
Low level alarm engaged

q Air detector engaged

q Pressure alarm limits set

q Temperature alarm limits set

q Cardiotomy reservoir vented

FOxygenator
q
Gas line attached

q Heat exchanger integrity inspected

q Scavenger attached

FDebubbling
q
Tubing

q Oxygenator

q Cardioplegia

q Arterial filter/Bubble trap

FAccessories
q
Tubing clamps

q Hand cranks

q Backup circuit components

FAnticoagulation
q
Heparin in: _______time

q Patient properly anti-coagulated

FReady to start bypass
q
Signature: ..........................................

The EBCP promotes the use of pre-bypass checklists in the practice of clinical perfusion. The suggestions in this checklist are designed as the minimum requirements for cardiopulmonary bypass procedures and each institution should adapt this to suit its own requirements. The EBCP can accept no liability whatsoever for the adoption and practice of this suggested checklist.

Organization Logo
Last Modified: 11-Aug-2006
Copyright © 1998 - 2007 by EBCP.